
Today I started by redoing some of the connections from yesterday of the battery bank. I also put on some stabilizers. I built a 3 channel 6/6/6 gauge wiring harness to carry power from port to starboard and drilled the holes and put it in. A new fuse panel on the starboard side on our wall of panels hosts connections for the fridge, a power outlet and a distribution box. The distribution box is located in the bathroom and can distribute to any switched low-watt DC stuff. Currently it is connected to two new vents (removed our vent stacks and put on some nice powered vent caps). All in all, a very productive day.

Tonight I updated our electrical system. I added a couple more Deka 8A8D batteries (12V / 245 AH AGM) so now we have a total of four. I also installed a DC breaker (I was using a fuse) in a nice housing and also installed an advanced DC monitoring system. The DC monitor will work with the charger to more accurately charge the batteries, and also give us a better idea of how much amp hours we have remaining (not just by a voltage measurement.) But the best part of the updated system is that we are now ready for solar. All we need is some panels, a way to mount them, a combiner box (circuit breaker type thing) and a MPPT charger. But don't worry, I think we'll wait until we're on the road for that, given what else we have to do.
Joni and I spent the day helping our friend Stuart put on a living history program for his elementary school. We taught kids woodworking in the year 1861. They were able to drill holes, saw and hammer and we made some nice boxes for carrying things, all using hand tools of the era.
With the updated electrical system and some other odds and ends in place, here is the updated list:

Here is a description of everything that would be nice to do before we leave. These things might not all get done before we leave, but understand that we are currently in a position to do great woodworking (planers / table saws / lumber yards) and great metal working (fabrication / welders) so there is a push to do that before we leave, but if we get too excited to leave, we can/will drop things from this list. "There is no guarantee that we will stay until this is all finished." Along the same lines, there will be things that we need to do that we just forgot about which may be added to the list.
I've broken the list first into area of the bus (or major theme), then secondly into project, then thirdly into steps. I break out the steps more in the beginning but then less near the end to try to save space / repetition.
Things to do after we leave:
Recent comments
1 year 22 weeks ago
1 year 22 weeks ago
1 year 45 weeks ago
2 years 23 weeks ago
2 years 24 weeks ago
2 years 49 weeks ago
3 years 18 weeks ago
3 years 19 weeks ago
3 years 19 weeks ago
3 years 19 weeks ago